eXTReMe Tracker
Turning Dreams into Reality
   
HOME
Garage Plans
Design Guides
Kitchen Design
Bathroom Design
Porch Design
Hallway Design
Dormer Windows
Roof Types
Open Plan Living
Feng Shui
Home Improvement
Loft Conversions
Garage Conversion
Home Extensions
Sun Lounges
Open Plan Kitchens
Conservatory
Our Projects
Around Your Home
Home Maintenance
Technical
Technical Advice
Building Regulations
Energy Saving
Building Management
Building Finance
Home Equity
Improvement Loans
Secured Loan
Unsecured Loans
Building Insurance
Building Contracts
Building Contracts
Insurance Extensions
JCT Contract
Selfbuild
Buy To Let
Radon Guide
Policy
About Us
Contact
Privacy Policy

Building Contracts

Anyone considering having major home improvement undertaken would be advised to have a contract made between them and the builder. Until recently most Building Contracts required a professional to be hired to administer the terms of the contract. This situation has now changed with the issue of the 'Home Owner Contract' but more about that later.

Firstly we must understand the basic principles of a contract.

There are three basic elements to any contract.
  • Agreement: The parties must have reached agreement.
  • Intention: The parties must have intended to create legal relations.
  • Consideration: According to the terms of the agreement some advantage moves from each party to the other. The giving of mutual advantages by the parties is the essence of a bargain.
In any transaction where one of these elements is missing there is no contract.

An agreement may be made in any manner whatsoever provided the parties are in communication. An agreement may be:
  • in writing, or
  • by word of mouth, or
  • by inference from the conduct of the parties and the circumstances of the case, or
  • by combination of the above.
Most problems in contracts are caused by breach of contract, where a party neglects or refuses to honour a contractual obligation, there is a breach of contract. A breach by one party causes a right of action to accrue to the other.

The usual remedy for breach of contract is damages, i.e. the award of a sum on money to put the aggrieved party in the position he would have enjoyed had the contract not been broken.

The two main standard forms of building contract used for domestic building work are the "Building Contract for a Home Owner / Occupier" and the "JCT Agreement for Minor Building Works (MW98)".

While care has been taken in preparing this note it should not be treated as definitive legal interpretation or commentary. You should seek proper legal advice from a suitable qualified person.

*Not for use in Scotland

 

Thinking of home improvments:
Call us on the number below or email us at info@carryduffdesigns.co.uk
We undertake projects within and around the following areas: All of Belfast, Newtownards, Bangor, Ards Peninsula, Comber, Ballynahinch, Downpatrick, Lisburn, Banbridge, Craigavon, Portadown, Newtownabbey and Carrickfergus.
 
   
Carryduff Designs 1 Thorndale Road North, Carryduff, Belfast. Tel: 028 90814106